NRC Guidance Applicable to Transition to NFPA 805

Document Title Description
69 FR 33536 10 CFR 50.48(c)  
69 FR 33684 NRC Interim Enforcement Policy, dated June 16, 2004  
70 FR 2662 Extension - Enforcement Discretion, dated January 14, 2005  
69 FR 60192 Federal Register Notice for DG 1139  
Feasibility Criteria ML033430017 FR.pdf Manual Actions Feasibility Criteria (draft) Opportunity for public comment
RG 1.174, Rev. 1

AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT-SPECIFIC CHANGES TO THE LICENSING BASIS

 
RG 1.205
(Draft was issued as DG-1139, dated September 2004)

RISK-INFORMED, PERFORMANCE-BASED FIRE PROTECTION FOR EXISTING LIGHT-WATER NUCLEAR POWER PLANTS

 
Draft Regulatory Guide 1136

DEMONSTRATING THE FEASIBILITY AND RELIABILITY OF OPERATOR MANUAL ACTIONS IN RESPONSE TO FIRE

 
Draft Regulatory Guide 1139

RISK-INFORMED, PERFORMANCE-BASED FIRE PROTECTION FOR EXISTING LIGHT-WATER NUCLEAR POWER PLANTS

 
RIS 2004-03 Rev. 1 Risk Informed Approach for Post-Fire Safe-Shutdown Circuit Inspections  
RIS 2005-07

COMPENSATORY MEASURES TO SATISFY THE FIRE PROTECTION PROGRAM REQUIREMENTS

 
RIS 2005-30

CLARIFICATION OF POST-FIRE SAFE-SHUTDOWN CIRCUIT REGULATORY REQUIREMENTS

 
IP-71111.05TTP

Fire Protection-NFPA 805 Transition Period (Triennial)

 
NUREG/CR-6775

Human Performance Characterization in the Reactor Oversight Process, dated March 2002

 
NUREG/CR-6850, Volume 1

EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities Volume 1: Summary and Overview; EPRI 1008239 NUREG/CR-6850

 
NUREG/CR-6850, Volume 2

EPRI/NRC-RES Fire PRA, Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology, EPRI 1008239 NUREG/CR-6850, October 2004

 
COMSECY

PROPOSED REVISION OF THE INTERIM ENFORCEMENT DISCRETION POLICY FOR THE FIRE PROTECTION RULE -10 CFR 50.48(c) (NFPA 805 RULE), dated March 6, 2006

The purpose of this memorandum is to request Commission approval of staff’s plan to publish a Federal Register Notice announcing a revision to the Enforcement Policy, to reflect the extension of the enforcement discretion period from two years to three years in the "Interim Enforcement Discretion Policy for the Fire Protection Rule" - 10 CFR 50.48(c).
SECY-2004-0233 Manual Actions Rulemaking  
NRC Observation Guide, Rev. D, dated January 14, 2005 DRAFT NFPA 805 TRANSITION PILOT PLANT OBSERVATION GUIDANCE, Rev. D, dated January 14, 2005.

 

Presentation to CRGR, dated May 24, 2005 "NFPA 805 Regulatory Guide", dated 05-24-2005, Presentation by Paul Lain, P.E., NRR Staff to CRGR  
NUREG 1805, December 2004 "Fire Dynamics Tools (FDSs) Quantitative Fire Hazard Analysis Methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program"