NRC Guidance Applicable to Transition to NFPA 805
| Document | Title | Description |
| 69 FR 33536 | 10 CFR 50.48(c) | |
| 69 FR 33684 | NRC Interim Enforcement Policy, dated June 16, 2004 | |
| 70 FR 2662 | Extension - Enforcement Discretion, dated January 14, 2005 | |
| 69 FR 60192 | Federal Register Notice for DG 1139 | |
| Feasibility Criteria ML033430017 FR.pdf | Manual Actions Feasibility Criteria (draft) | Opportunity for public comment |
| RG 1.174, Rev. 1 |
AN APPROACH FOR USING PROBABILISTIC RISK ASSESSMENT IN RISK-INFORMED DECISIONS ON PLANT-SPECIFIC CHANGES TO THE LICENSING BASIS |
|
|
RG 1.205 (Draft was issued as DG-1139, dated September 2004) |
RISK-INFORMED, PERFORMANCE-BASED FIRE PROTECTION FOR EXISTING LIGHT-WATER NUCLEAR POWER PLANTS |
|
| Draft Regulatory Guide 1136 |
DEMONSTRATING THE FEASIBILITY AND RELIABILITY OF OPERATOR MANUAL ACTIONS IN RESPONSE TO FIRE |
|
| Draft Regulatory Guide 1139 |
RISK-INFORMED, PERFORMANCE-BASED FIRE PROTECTION FOR EXISTING LIGHT-WATER NUCLEAR POWER PLANTS |
|
| RIS 2004-03 Rev. 1 | Risk Informed Approach for Post-Fire Safe-Shutdown Circuit Inspections | |
| RIS 2005-07 |
COMPENSATORY MEASURES TO SATISFY THE FIRE PROTECTION PROGRAM REQUIREMENTS |
|
| RIS 2005-30 |
CLARIFICATION OF POST-FIRE SAFE-SHUTDOWN CIRCUIT REGULATORY REQUIREMENTS |
|
| IP-71111.05TTP |
Fire Protection-NFPA 805 Transition Period (Triennial) |
|
| NUREG/CR-6775 |
Human Performance Characterization in the Reactor Oversight Process, dated March 2002 |
|
| NUREG/CR-6850, Volume 1 |
EPRI/NRC-RES Fire PRA Methodology for Nuclear Power Facilities Volume 1: Summary and Overview; EPRI 1008239 NUREG/CR-6850 |
|
| NUREG/CR-6850, Volume 2 |
EPRI/NRC-RES Fire PRA, Methodology for Nuclear Power Facilities, Volume 2: Detailed Methodology, EPRI 1008239 NUREG/CR-6850, October 2004 |
|
| COMSECY |
PROPOSED REVISION OF THE INTERIM ENFORCEMENT DISCRETION POLICY FOR THE FIRE PROTECTION RULE -10 CFR 50.48(c) (NFPA 805 RULE), dated March 6, 2006 |
The purpose of this memorandum is to request Commission approval of staff’s plan to publish a Federal Register Notice announcing a revision to the Enforcement Policy, to reflect the extension of the enforcement discretion period from two years to three years in the "Interim Enforcement Discretion Policy for the Fire Protection Rule" - 10 CFR 50.48(c). |
| SECY-2004-0233 | Manual Actions Rulemaking | |
| NRC Observation Guide, Rev. D, dated January 14, 2005 | DRAFT NFPA 805 TRANSITION PILOT PLANT OBSERVATION GUIDANCE, Rev. D, dated January 14, 2005. |
|
| Presentation to CRGR, dated May 24, 2005 | "NFPA 805 Regulatory Guide", dated 05-24-2005, Presentation by Paul Lain, P.E., NRR Staff to CRGR | |
| NUREG 1805, December 2004 | "Fire Dynamics Tools (FDSs) Quantitative Fire Hazard Analysis Methods for the U.S. Nuclear Regulatory Commission Fire Protection Inspection Program" |